CFHI celebrated the delivery of the first forged pump case for nuclear plant Hualong No.1 project

发布时间:2016年06月27日 浏览次数:

  On June 27th, 2016, in close cooperation with CNNC and Harbin Power, CFHI accomplished the assessment and first article manufacture of forged pump case for Hualong No.1 project . It indicates that CFHI possesses the manufacturing capacity of the forged pump case for Hualong No.1 project, which brings Chinas localization of Nuclear Power Equipment to a new stage. At noon on 27th, the delivery ceremony was held in CFHI.

  Leaders concerned in CNNC, CNNC Nuclear Power Co., CNPE, NPIC, Fuqing Nuclear Power Co., Ltd, Harbin Electric, Harbin Electric Power Equipment Co., Ltd and Liu Mingzhong, chairman and Party Secretary of CFHI are present in the ceremony.

  CFHI has formed the capability to manufacture 10 sets of heavy castings and forgings and related equipments of primary loop for nuclear island and 5 sets of heavy castings and forgings for conventional island equipments every year, which is a strong guarantee to the Regulation and Upgrading of Energy Industry Structure and the national economic security.

  Liu Mingzhong, chairman and Party Secretary of CFHI, said that CFHI would carry out extensive cooperation with CNNC, Harbin Power and so on in the area of R&D of key technology, quality management control and nuclear safety culture construction. Committed to synergy benefit, integration of industry resources and further strategic cooperation, CFHI would form a industrial pattern of win-win and a industrial train of coordinated development and positive interaction, thus promote the sustainable healthy development of energy industries and equipment manufacturing industry comprehensively, leading "Going abroad" of China`s nuclear power industry to compose a new chapter of self-reliant brand of nuclear industry.